DTP-2700
publishdate:2019-09-23 views:238
Tongmei Tu t8 polymer waterproofing paste is a two-component slurry which is compounded by a special synthetic acrylic emulsion and inorganic powder and various additives in scientific proportion.
Performance
Features
▲ can be directly applied to concrete surface
▲Excellent bonding performance and short setting time.
▲ non-toxic, tasteless, non-polluting
▲Safe and simple construction, short construction period
Scope of application
▲It is suitable for waterproofing of buildings, toilets, kitchens, balcony floors and other projects.
Process flow
▲ construction method
▲Pour the liquid material into the mixing tank first, and slowly add the powder while stirring. After thoroughly stirring, it can be used in the form of a slurry without agglomerate. It should be finished with a roller or a brush. It should be completed at least twice, the second layer. The direction of painting should be vertical.Each layer is painted at intervals of 8 hours, and winter should be extended.
The thickness of each coating film is 0.7mm, and the total thickness of the waterproof layer needs to be 1.5mm.
▲ proportioning: liquid material: powder = 10:35 (weight ratio)
1mm thick film about 2.0-2.5kg/m3
Precautions
▲After the waterproof layer is completely dry, it can be used as another cover layer.
▲The configured slurry should be used within 1 hour. It is strictly forbidden to add water during use.
▲ cross-painting method in construction
▲It is suitable to be constructed in an environment of 5 to 40 degrees Celsius to ensure ventilation in the construction environment.
▲This product contains alkaline ingredients, which may cause skin irritation. It is best to wear gloves when handling.
Tongmei Tu t8 polymer waterproofing paste is a two-component slurry which is compounded by a special synthetic acrylic emulsion and inorganic powder and various additives in scientific proportion.
Performance
Features
▲ can be directly applied to concrete surface
▲Excellent bonding performance and short setting time.
▲ non-toxic, tasteless, non-polluting
▲Safe and simple construction, short construction period
Scope of application
▲It is suitable for waterproofing of buildings, toilets, kitchens, balcony floors and other projects.
Process flow
▲ construction method
▲Pour the liquid material into the mixing tank first, and slowly add the powder while stirring. After thoroughly stirring, it can be used in the form of a slurry without agglomerate. It should be finished with a roller or a brush. It should be completed at least twice, the second layer. The direction of painting should be vertical.Each layer is painted at intervals of 8 hours, and winter should be extended.
The thickness of each coating film is 0.7mm, and the total thickness of the waterproof layer needs to be 1.5mm.
▲ proportioning: liquid material: powder = 10:35 (weight ratio)
1mm thick film about 2.0-2.5kg/m3
Precautions
▲After the waterproof layer is completely dry, it can be used as another cover layer.
▲The configured slurry should be used within 1 hour. It is strictly forbidden to add water during use.
▲ cross-painting method in construction
▲It is suitable to be constructed in an environment of 5 to 40 degrees Celsius to ensure ventilation in the construction environment.
▲This product contains alkaline ingredients, which may cause skin irritation. It is best to wear gloves when handling.